Inaccurate bill of materials and routing definitions disrupt production schedules, create cost variances, and disrupt material plans. Connect materials, work instructions, and overhead costs to an operation to accommodate the time phased release of materials.
• Effective/Expiration Dates
• Phantom Bills of Material
• BOM Cost Rollup
• Multi-Level BOM
Create, Maintain, and Control Bill of Materials and Labor Definitions for Products and Production Processes The Bill of Materials (BOM) and Routing application, part of the Acumatica Manufacturing Edition, creates production specifications forming the framework for planning functionality in all Acumatica Manufacturing Edition applications.
Maintenance of the BOM and Routing information is performed through a single screen. Revision control is available with the optional Engineering Change Control application or Acumatica for Arena Native Connector to enforce change management business processes and approvals for engineering revisions.
Acumatica utilizes an integrated bill of materials and routing system, where defined steps in the production process encompass both material and labor operations. This structure is standard in most modern ERP applications.
INTEGRATED BOM AND ROUTING
• Directly connect materials, work instructions, attributes, and overhead costs with manufacturing labor operations.
• Allow for the time-phased release of materials.
MULTILEVEL BOM AND ROUTING
• List the components required to produce an item and any sub-assemblies with their components.
• Provide an engineering and a costed view of the entire product structure.
Key business benefits
• Maintain a complete revision history of your BOM/Routing.
• View past and future revisions.
• Identify revision reasons.
• Group change requests for approval.
• Allow for multiple costing methods, including average, standard, and actual costs.
• Add tooling costs and overhead costs, both fixed and variable.